Automatic round bottle labeling machine Semi-automatic high precision flat labeling machine Side labeling machine
by:Zhongya Packaging
2022-05-19
When many customers consult, they will ask how long it will be delivered. Generally, the customization and debugging time of a non-standard equipment is 3 months, and there is still some communication and finalization work in the early stage. In order to avoid that the equipment only satisfies the assembly of the product, the production process and inspection requirements are ignored. There are more and more companies doing non-standard automation equipment in China, and the industries they touch are getting wider and wider, and the industry segmentation is becoming clearer and clearer. Because of the versatility of the industry, many customers cannot accurately find suitable suppliers at the initial stage. Therefore, the equipment made by manufacturers cannot meet the actual requirements of customers. When many customers consult, they will ask how long it will be delivered. Generally, the customization and debugging time of a non-standard equipment is 3 months, and there is still some communication and finalization work in the early stage. In order to avoid that the equipment only satisfies the assembly of the product, the production process and inspection requirements are ignored. A dedicated engineer is responsible for each cooperation project of automation, who will go to the customer site to understand the specific process and assembly process of the product. For example: Human-machine cooperation with the humanized consideration of workstation design, the state that the product should maintain before each process operation, the position of the head wheel, the number of turns of the mainspring, the position and quantity of the oil. Analysis and treatment of the basic situation of defective products. Only by understanding the entire production process, integrating oneself into the actual production of the customer, and combining the company's design strength, with the previous equipment examples as the basis, can we make equipment that satisfies customers. Such equipment is a non-standard equipment that is down-to-earth and does not boast, and is more in line with customer requirements. The above is an explanation of how long it takes for non-standard customized equipment. I hope to help everyone. Also want to know more information about non-standard custom labeling machine, welcome to inquire.
Custom message